Last updated: 2021-11-29

Checks: 2 0

Knit directory: proxyMR/

This reproducible R Markdown analysis was created with workflowr (version 1.6.2). The Checks tab describes the reproducibility checks that were applied when the results were created. The Past versions tab lists the development history.


Great! Since the R Markdown file has been committed to the Git repository, you know the exact version of the code that produced these results.

Great! You are using Git for version control. Tracking code development and connecting the code version to the results is critical for reproducibility.

The results in this page were generated with repository version 58fbba1. See the Past versions tab to see a history of the changes made to the R Markdown and HTML files.

Note that you need to be careful to ensure that all relevant files for the analysis have been committed to Git prior to generating the results (you can use wflow_publish or wflow_git_commit). workflowr only checks the R Markdown file, but you know if there are other scripts or data files that it depends on. Below is the status of the Git repository when the results were generated:


Ignored files:
    Ignored:    .DS_Store
    Ignored:    .Rhistory
    Ignored:    .Rproj.user/
    Ignored:    proxyMR_figure_data.RData
    Ignored:    renv/library/
    Ignored:    renv/local/
    Ignored:    renv/staging/

Untracked files:
    Untracked:  R/proxyMR_figures.R
    Untracked:  R/proxyMR_hiercharchy.R
    Untracked:  analysis/project_status.Rmd

Unstaged changes:
    Modified:   analysis/index.Rmd
    Modified:   analysis/setup.Rmd
    Modified:   analysis/todo_list.Rmd
    Modified:   analysis/update_meeting_15_10_2021.Rmd

Note that any generated files, e.g. HTML, png, CSS, etc., are not included in this status report because it is ok for generated content to have uncommitted changes.


These are the previous versions of the repository in which changes were made to the R Markdown (analysis/meetings.Rmd) and HTML (docs/meetings.html) files. If you’ve configured a remote Git repository (see ?wflow_git_remote), click on the hyperlinks in the table below to view the files as they were in that past version.

File Version Author Date Message
Rmd 58fbba1 jennysjaarda 2021-11-29 wflow_publish(“analysis/meetings.Rmd”)
Rmd ee26dc4 Jenny Sjaarda 2021-11-22 Build site.
html ee26dc4 Jenny Sjaarda 2021-11-22 Build site.
html 48eadf4 jennysjaarda 2021-11-22 Build site.
Rmd 28daebc jennysjaarda 2021-11-22 wflow_publish(“analysis/meetings.Rmd”)
html 455a43a jennysjaarda 2021-11-02 Build site.
Rmd ce5af1d jennysjaarda 2021-11-02 wflow_publish(“analysis/meetings.Rmd”)
html e931aa9 jennysjaarda 2021-10-18 Build site.
Rmd 9cbaff6 jennysjaarda 2021-10-18 add updated meeting 15-10-21 to meetings doc
html d4fa194 jennysjaarda 2021-09-24 Build site.
Rmd 04bff38 jennysjaarda 2021-09-24 add link to 23-09-21 meeting
html e0e1d69 jennysjaarda 2021-09-15 Build site.
Rmd 49882d8 jennysjaarda 2021-09-15 misc website updates
Rmd b849be4 jennysjaarda 2021-08-31 clean up some website docs
html b849be4 jennysjaarda 2021-08-31 clean up some website docs
html a55da5b jennysjaarda 2021-07-22 Build site.
Rmd b0b81d9 jennysjaarda 2021-07-22 Updating website
html bb3ede3 jennysjaarda 2021-07-22 Build site.
Rmd 6ee0589 jennysjaarda 2021-07-22 Add generic meetings page
Rmd 750d442 jennysjaarda 2021-06-16 add website docs

In general, update meetings were held with Zoltan once per week.

Meeting minutes can be found at the links below (DD-MM-YYY).

  1. Initial meeting: 04-06-2021
  2. 14-06-2021
  3. 05-07-2021
  4. 14-07-2021
  5. 25-08-2021
  6. 06-09-2021
  7. 23-09-2021
  8. 15-10-2021
  9. 25-10-2021
  10. 03-11-2021
  11. 11-11-2021
  12. 29-11-2021